TEB | Tunnel Frame (2-Cell) | Update Information
02/22
Internal
Technical adjustments
01/22
Internal
Technical adjustments
02/21
Codes
The Polish Euroocde has been implemented.
01/18
Internal
Technical adjustment
01/17
Correction
Output for the Loads corrected.
02/16
Eurocodes
DIN EN 1992:2015 und BS EN 1992:2015 implementiert.
01/16
Internal
Technical adjustment
02/15
Addition
Eurocodes DIN EN 1992:2013 and BS EN 1992:2009 implemented.
01/15
Internal
Technical adjustment
01/13B
maxmin superposition
Using the maxmin-superpositon a software crash could happen if the preview was uses directly after starting the application.
01/13A
general
Translations.
01/13
design standards
Since this version national annexes DIN EN 1992:2012, CSN EN 1992:2011, NBN EN 1992:2010, NEN EN 1992:2011, NTC EN 1992:2008, PN EN 1992:2010 are implemented.
01/11B
shear force proof
At shear force proof it always was calculated with effective height of the sole. This problem was solved.
01/11A
surface
The order of input according predefined superpositions and max/min-superpositions has been modified.
01/11
output
A problem while putting out an old position was solved.
01/10A
Data
A problem while loading and saving was solved.
01/10
output
Correction at name of program.
02/09
dialogue of expositionsclasses for EN2 D, A, GB integrated.
01/09
PDF-help integrated.
Norms: EN2 D, A, GB integrated.